Calculate your startup costs
U.S. Small Business AdministrationSupports: Startup-planning categories and the separation of one-time and ongoing costs.
Open primary source ↗Loading…

Free operator tool
Turn the fuzzy middle between signed lease, equipment order, staff training, and soft launch into an owned plan—with questions to verify, not invented legal conclusions.
The tool
Answer eight questions about the project — type, stage, space, modalities, staff, vendor, financing, software — and the planner narrows a full launch down to the work that actually applies to it.
This is the longest of the five views. On a phone the vendor frame stops at about 4,000px, which lands part-way through the plan — open it in its own tab to reach the later phases.
Preparing Launch & Expansion Planner…
This planner organizes project work and questions to verify. It does not determine whether a permit, license, inspection, insurance policy, clinical rule, or legal requirement applies. Confirm requirements with the relevant authority and qualified advisors.
Sample walkthrough
A fictional 'Add a modality' project, answered honestly, produces a plan shaped like this — sequenced work plus questions to verify, never invented legal conclusions.
The project answers entered
Add a modality to an existing studio
Cold plunge, two units
Existing wet-capable room
Current team, not yet trained on the new protocol
Cash — no lender milestones
What the planner returns
Modality additions skip the site-search and lease phases
Drainage and electrical verification → vendor order and install window → staff training and SOP sign-off → soft launch
'Schedule installer' stays blocked until the utility-verification task has evidence attached
Permit, sanitation, and insurance items generate as questions for your local authority and broker — never as legal determinations
Weighted completion across applicable tasks; critical weight-3 items move it fastest
A fictional walkthrough of the planner's structure. Which tasks apply depends on your answers, and jurisdiction-dependent items always route to the authority or advisor who can actually decide them.
What you get
Keep going
Fifteen chapters of what to build once the doors work, aimed at a studio that keeps running on the days the owner is not in it.
Checklist · 75 points · 15 chapters
Fifteen chapters of editorial actions for a studio that should not depend on the owner, with your progress kept in this browser.
Open the blueprintOne email a week for people running physical recovery and wellness studios, written by the team building Praxium.
Free. Unsubscribe any time. We store your address for the brief, notify our team of the signup and hash it for ad measurement: Privacy policy
Methodology
Method 1.0.0, published 2026-07-22. Next review: 2026-10-22.
Source ledger
Each source is tied to the part it supports; a link is not treated as blanket approval for every output.
Supports: Startup-planning categories and the separation of one-time and ongoing costs.
Open primary source ↗Supports: The condition-driven task structure, dependencies, and weighted completion score.
Read source →Toolkit
Every tool keeps its assumptions and limits visible, so a result from one is safe to carry into another.
Model capacity, session economics, fixed and variable costs, debt service, break-even utilization, and payback from your own recovery-studio assumptions.
Open the Studio Economics CalculatorScreen wellness marketing copy for high-risk claim language, unsupported quantified outcomes, and missing citation links before human review.
Open the Claims & Citation CheckerExplore modality representation in a dated, source-backed recovery-studio research sample—with denominators, missingness, and confidence shown.
Open the Market Gap ExplorerPreview the measurement framework, data dictionary, exclusions, and release standard for Praxium's future State of Recovery Studios dataset.
Open the State of Recovery StudiosLay out a floor, write a booking sheet for one open block, and replay it. Then type your own tiers, prices and rates and watch a month-by-month projection built from those entries alone.
Open Studio SimThree guided drafts — the first three visits, the method in the owner's head, and a membership someone can explain at the desk — each one leaving as a file you can edit.
Open the Playbook LabLaunch & Expansion Planner
No. It generates authority and advisor questions based on your project, but it does not make jurisdiction-specific legal or regulatory determinations.
Yes. Choose Add a modality and the planner narrows the work to utilities, vendor, integration, training, SOP, pricing, launch, and post-launch review tasks.
It is weighted checklist completion across applicable tasks. It is not a probability that the business will open on time or perform financially.
The planner does not predict a date, because no honest tool can from a form. It organizes the work by phase, from thesis through expansion, and shows which critical-path tasks are blocked; the real timeline depends on permits, build-out, equipment lead times, and staffing in your jurisdiction.
They pair well in either order. The calculator pressure-tests whether the room is worth building; the planner turns a go decision into sequenced work. Both keep every assumption editable, so a changed vendor quote updates your thinking in both places.
The published view produces a downloadable plan built to move into whatever project system your team already uses, and each task carries an owner class, status, and evidence field so the work can be split cleanly.
Praxium carries the sequenced work into the shifts that have to do it, with the owner class, the evidence and the blocked dependency attached to each task.